SCRUFFY CITY CONSTRUCTION
Build With Scruffy City
Tennessee Licensed General Contractor
Custom Home Preconstruction

Build it on paper before we price it in the field.

This selection worksheet defines the level of home you want us to bid. Choose the systems, finishes and features that matter to you so we can price the same house you are actually expecting to build.

Foundation
Exterior
Kitchen
Bedrooms
Bathrooms
HVAC
Electrical
Finish Grade
0% selected

Project information

This becomes the basis of the Scruffy City Construction bid.

Overall home grade

Pick the closest overall expectation. Individual selections below will override this.

01

Foundation & structure

Choose how the home sits and the level of structural / insulation package expected.

BIG COST DRIVER
02

Exterior architecture

Define the siding, cedar accents, roofing, windows and entry package.

CURB APPEAL

Siding & exterior finish

03

Kitchen

This is usually the largest interior pricing swing. Define cabinets, tops and appliance configuration.

BIG COST DRIVER

Appliance configuration

04

Bedrooms

Grade each bedroom independently, then select the flooring, ceiling and closet expectation.

ROOM-BY-ROOM

Primary bedroom





Bedroom 2





Bedroom 3





05

Flooring, walls & ceilings

Define the finish language through the main living areas.

06

Bathrooms

Set the primary bath separately from secondary baths.

BIG COST DRIVER

Primary bath



Secondary baths



07

HVAC & comfort

Pick the equipment tier and efficiency expectation, not merely a brand name.

SYSTEMS
08

Plumbing, electrical & technology

Capture the infrastructure choices that are expensive to add later.

09

Special features & priorities

Tell us where to spend the money and where to keep the build disciplined.

10

Bid exclusions & acknowledgement

These items are not included in the initial pricing basis unless specifically added later in writing.

Initial bid exclusions: driveway construction and exterior deck finish materials / decorative deck finishes. Site-specific unforeseen conditions, utility extensions, retaining structures and other work not shown in the construction documents will be identified separately where applicable.

Selections establish the pricing basis. Exact products may be carried as allowances until final selections are approved. Changes after bidding or construction start may affect price and schedule.

Send your project selections

Scruffy City Construction will review your selections before preparing pricing. Customer name, project address, email and phone are required. If you are still looking for land, enter the city or area in the project address field.